Hub · data packages

Post-test data interpretation and decision packages.

The test is finished when someone can make a decision — not when the last chart is emailed as a 40-megabyte PDF.

Independent

We design the test and pick who runs it. We do not sell separators or truck time.

Western Canada

Alberta focus; Calgary / Edmonton-area operators and consultants. Saskatchewan and BC welcome.

1-business-day SLA

Complete inquiries get a program outline within one business day.

Clean data package

Results packaged for decisions — not a chart dump from the lease.

A usable package has context: what was supposed to happen, what actually happened, which gauges are trustworthy, and which periods are interpretable. Most field reports skip that and jump to a plot.

We specify the package before the test: channels, sampling, events, and the interpretation questions. After the job we assemble a decision package and hand PTA / reservoir work to partner experts against a written scope. You see assumptions, not a black box.

This is also where we catch the expensive mistake: changing a completions plan off a report nobody has interrogated. If the falloff was contaminated or the separator was in carry-over, we say so before you redesign the frac.

  • Package specified before mobilization
  • Event log, gauge QA, and period flags — not just plots
  • Partner PTA / reservoir interpretation against a defined scope
  • Decision memo: what you can and cannot conclude
  • Program outline within 1 business day

Welltest Advisory provides independent program design, vendor matching, coordination, and data-package support. Licensed service companies perform field work, operate equipment, and hold the relevant tickets. AER-aware language on this site is planning guidance, not legal, regulatory, or engineering stamp advice.

Original schematic — not a vendor drawing.

FAQ

Do you replace our reservoir engineer?

No. We make the data usable and bring partner PTA specialists when the interpretation is the product.

Can you work from an old test?

Sometimes. Send the report and raw files. We will tell you if it is interpretable before you spend on a restudy.

What is in a decision package?

Program vs actual, data QA, interpretable periods, conclusions with confidence, and open questions.

Next step

Send the well. Get a program outline within 1 business day.

Company, location, well type, objective, timeline, and H2S — enough to start. We design the test; licensed companies run the iron.

Request a program review

Company, name, and phone required. You get a program outline within 1 business day. Alberta / Western Canada focus.

Thanks — we received your request. Expect a program outline within 1 business day. Call {{QUO_NUMBER}} if the well is on the critical path.
Call Request program review