Reading a well-test report: questions to ask before you change the completions plan.
A thick PDF is not a decision. Interrogate the periods, the gauges, and the story before you change the well.
Before you believe the conclusion
- What was the written objective, and did the as-run program match it?
- Which gauges were used, where, and which ones drifted or dropped out?
- Which flow and shut-in periods are actually interpretable?
- Was the separator in carry-over, slugging, or off-chart rates?
- Did H2S, sand, or hydrate events truncate the test?
- Are samples tagged to periods you still trust?
- Is the interpretation a model or a field anecdote in fancy software?
Completions-plan test
If changing stage count, fluid, or well placement depends on this file, require a decision memo that states confidence and what would falsify the recommendation. No memo, no change.
We assemble that memo as a data package and can hand PTA to partner experts.
If the file is junk
Say so early. A restudy cannot recover a falloff that was never recorded. The next-dollar decision is often a designed retest, not another slide deck.
Welltest Advisory provides independent program design, vendor matching, coordination, and data-package support. Licensed service companies perform field work, operate equipment, and hold the relevant tickets. AER-aware language on this site is planning guidance, not legal, regulatory, or engineering stamp advice.