Guide · sour

Critical sour well testing checklist for Alberta.

Sour tests fail in planning. Use a checklist before anyone quotes iron. This is not a regulatory filing and not legal advice.

Read this first

Welltest Advisory provides independent program design, vendor matching, coordination, and data-package support. Licensed service companies perform field work. AER-aware language is planning guidance, not legal, regulatory, or engineering stamp advice.

Licensee obligations, ERP, and AER submissions stay with you. We use this list to design a test program that does not fight those obligations.

Planning checklist

  • Expected H2S (and how you know), plus a high-case
  • Whether the well is or may be critical sour under your classification process
  • Release, ignition, flare, and setback implications at the planned rates
  • Equipment class and redundancy the program actually needs
  • Personnel tickets, monitoring, and medical / rescue interfaces
  • Measurement plan if rates must be limited
  • Vendor sour competency — not a generic testing ticket
  • Independent oversight: yes/no, and stop-work authority
  • Data package: what you still need if the flow is cut short

Next step

If any line is unknown, that is the program-design problem. Do not bury it in a vendor’s assumptions.

Related: critical sour hub, oversight packages, mobilization checklist.

Welltest Advisory provides independent program design, vendor matching, coordination, and data-package support. Licensed service companies perform field work, operate equipment, and hold the relevant tickets. AER-aware language on this site is planning guidance, not legal, regulatory, or engineering stamp advice.

Request a program review

Company, name, and phone required. You get a program outline within 1 business day. Alberta / Western Canada focus.

Thanks — we received your request. Expect a program outline within 1 business day. Call {{QUO_NUMBER}} if the well is on the critical path.
Call Request program review