Guide · DFIT

DFIT vs mini-frac: what operators actually need from the test.

If you cannot say which decision the injection supports, you do not have a DFIT program. You have a small pump with leftover gauges.

Two different jobs

A diagnostic fracture injection test is designed to see closure and, if you stay long enough and the rock cooperates, after-closure behaviour. A mini-frac is often a small stim or a breakdown with whatever falloff you get before the next operation.

Both can be useful. They are not interchangeable on a bid sheet.

What to demand

  • The question: stress calibration, permeability indication, or both
  • Injection volume and rate bounds — and why
  • Falloff duration you will actually protect
  • Isolation method (including FBA) that makes the injection see the zone
  • Gauge type, placement, and sampling
  • Who interprets, against what scope

When a mini-frac is enough

If you only need a breakdown and a rough ISIP to start a frac, say that. Do not pay DFIT money for it, and do not pretend the file is a reservoir study.

Related: DFIT design + FBA coordination, DFIT hub, reading a well-test report.

FactorDesigned DFITMini-frac / breakdown
Primary productClosure, leakoff, optional after-closureBreakdown, rough ISIP, maybe a small stim
FalloffProtected duration in the programOften truncated by the next op
IsolationSpecified so the injection sees the zoneWhatever is already in the hole
InterpretationScoped PTA / specialistOften a field plot only
When to chooseCompletions or reservoir decision depends on the diagnosticYou only need to break down and move on

Welltest Advisory provides independent program design, vendor matching, coordination, and data-package support. Licensed service companies perform field work, operate equipment, and hold the relevant tickets. AER-aware language on this site is planning guidance, not legal, regulatory, or engineering stamp advice.

Request a program review

Company, name, and phone required. You get a program outline within 1 business day. Alberta / Western Canada focus.

Thanks — we received your request. Expect a program outline within 1 business day. Call {{QUO_NUMBER}} if the well is on the critical path.
Call Request program review